We are looking for a designer to help us designing a new enclosure and a shop which can print us 90 of these designs.
the design is based on a part from Digikey.com, part number cn-6707.
What are the lead times for these parts typically? We need those pretty quickly (20 of those in about 10 days) and then 20 every week.